How Boat Slip Subleases Work at The Reserve: A Plain-English Guide

Boat slips at The Reserve are planned, not built. Only lot owners can have one, and it is a sublease through the community association, not a deed. Dock construction is scheduled to begin in January 2027, and slips on Lake James are limited, so reservations are being taken now.
How does the sublease work?
Duke Energy manages Lake James. The plan is for Duke Energy to lease the slip facility to the community association, and for the association to sublease individual slips to lot owners. The plan includes 113 slips, and that number is fixed.
A slip reservation is an addendum to your lot contract. It includes a copy of the contract and the sublease. Once in place, the slip is tied to your lot and stays with it.
Who can have a slip?
Only property owners at The Reserve. The public cannot rent or buy one. If you own a lot but do not sublease a slip, you have no individual slip, although the Property Report says any lot owner may be able to use a community slip when one is available.
What does it cost?
A separate boat slip HOA fee applies, in addition to your lot's association assessment. Ask the team for the current amount in writing before you reserve.
What are the risks?
Be clear-eyed about these.
The slips are not built yet. The Property Report says the developer cannot promise or guarantee they will be built.
The Duke Energy lease can be terminated for several reasons, including a federal order, and a sublease can end if the lease ends.
A slip sublease can be assigned only with the written approval of the association.
Does a slip raise resale value?
Nobody can promise that. Slips on Lake James are limited, and only lot owners can have one, which is why many buyers want one. The Property Report is also direct that the resale of any lot can be difficult. Buy a slip because you will use it, not because you expect a premium later.
Frequently asked questions
Are the boat slips deeded?
No. They are subleased through the association.
How many slips are planned?
113 slips are planned.
When will the docks be built?
Dock construction is scheduled to begin in January 2027.